摘要 |
PROBLEM TO BE SOLVED: To provide a print schedule planning method, a print schedule planning system, and a print schedule planning program storage medium capable of flexibly facilitating a countermeasure even to the change of a process. SOLUTION: This system is provided with a GUI 41 having an input screen 41-1 for inputting objects whose orders are received, a condition designation screen 41-2 for deciding the resources and man-hours of each process, and a schedule confirmation screen 41-3 for confirming the schedule, a schedule engine 42 into which the scheduling algorithm of the earliest schedule method and the latest schedule method is integrated for scheduling processes after a ready for the press point by the latest schedule method, and for scheduling processes before the ready for the press point by the earliest schedule method, and a data base 43 having an order reception table 43-1, a continuous process designation table 43-2, a process resource table 43-3, a schedule work table 43-4, and an operation schedule table 43-5. |