摘要 |
PROBLEM TO BE SOLVED: To positively carry out framing of a permanent form in construction of a cellular concrete structure. SOLUTION: A number of main columns are vertically fixed beforehand to foundation concrete arranged at a lower end in a region where cellular concrete is placed, and then panel-type permanent forms are connected together so as to be stacked to a constant height. Next, the permanent form and the main column are rigidly connected together by a front support, then a buried resisting member is mounted on one side of the main column opposite to the permanent form, and the buried resisting member and the main column are connected together by a rear support, to thereby frame the permanent form. Thereafter, the framing is successively carried out to a predetermined height while the cellular concrete is placed to the constant height.
|