发明名称 SHEET PILE FOR PREVENTING SETTLEMENT OF SOFT FOUNDATION AND CONSTRUCTION METHOD THEREOF
摘要 PURPOSE: A sheet pile for preventing the settlement of a soft foundation is provided to prevent the settlement of the ground by grouting filler to a gap simultaneously with the removal of a sheet pile. CONSTITUTION: A sheet pile for preventing the settlement of a soft foundation comprise: at least one or more grouting pipes(20) installed to the longitudinal direction of a sheet pile(10) drove on the ground; a spiral pipe(21) formed on the top end of the pipe(20) and connected with a hose supplying filler(F) such as cement paste or mortar, etc.; and a cover(30) installed to the lower end of the pipe(20) ,having a function as a check valve by closing a way out of a pipe line when driving the sheet pile(10) and discharging filler supplied through the pipe(20) by opening the way out during a pull-out process.
申请公布号 KR20010095959(A) 申请公布日期 2001.11.07
申请号 KR20000019473 申请日期 2000.04.14
申请人 DOHWA CONSULTING ENGINEERS CO., LTD. 发明人 JUN, HONG GEON
分类号 E02D5/04;(IPC1-7):E02D5/04 主分类号 E02D5/04
代理机构 代理人
主权项
地址