发明名称 |
CONSTRUCTION METHOD OF BRIDGE ABUTMENT |
摘要 |
PURPOSE: A construction method of a bridge abutment is provided to overcome difficulties on installing an anchor according to the usage of many reinforcing bars even though an earthquake-resistant plan is applied to the construction of a bridge. CONSTITUTION: A construction method of a bridge abutment comprises the steps of; forming a bearing wall(210) covering a bed plate on the upper part of a pier(200); fitting the bed plate to a space(220) covered by the wall; and injecting mortar a gap between the bed plate and the space.
|
申请公布号 |
KR20010091695(A) |
申请公布日期 |
2001.10.23 |
申请号 |
KR20000013657 |
申请日期 |
2000.03.17 |
申请人 |
HYUPSUNG IND. CO., LTD.;PARK, YOUNG SUN |
发明人 |
PARK, YOUNG SUN |
分类号 |
E01D19/02;(IPC1-7):E01D19/02 |
主分类号 |
E01D19/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|