发明名称 SYSTEM AND METHOD FOR PRODUCTION PLANNING AND SYSTEM AND METHOD FOR MATERIAL REQUIRED CALCULATION AND RECORDING MEDIUM
摘要 <p>PROBLEM TO BE SOLVED: To shorten the processing time of material required calculation from the temporary certified data of a schedule plan by improving the calculating efficiency of the material required calculation of an MRP. SOLUTION: A necessary production calculating part 105 merges an order reception order 103 with a monthly production plan 104, and collates the result with product inventory 113, and prepares a production order 106 based on the insufficient situation of the product inventory 113. The production order 106 is registered as a schedule object. Then, a schedule plan temporary certified schedule 108 based on the schedule object is prepared by a schedule plan preparing part 107. Then, material required calculation is operated based on the schedule plan temporary certified schedule 108, and written in an order request order 110, and this order request order 110 is linked to a purchasing system 111. Thus, it is possible to sharply shorten a processing time by operating the material required calculation based on the schedule plan temporary certified data by schedule units.</p>
申请公布号 JP2001282341(A) 申请公布日期 2001.10.12
申请号 JP20000094818 申请日期 2000.03.30
申请人 NEC CORP 发明人 SEKI YASUHIRO
分类号 G06Q50/00;G05B19/418;G06Q50/04;(IPC1-7):G05B19/418;G06F17/60 主分类号 G06Q50/00
代理机构 代理人
主权项
地址