摘要 |
<p>A method for scheduling a plurality of virtual machines includes: determining a resource requirement (Xi) for each virtual machine (VM); determining an interrupt period (Yi) for each VM; and scheduling the plurality of VMs based, at least in part, on each respective Xi and Yi.</p> |