发明名称 CONTINGENCY PLANNING IN A SCHEDULING PROCESS
摘要 Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data (11) corresponding to schedules of the tasks that individual ones of th e resources are to carry out, from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period. The scheduled tasks ar e provided with associated contingency values (C) which are each computed as a function of the difference between the time that a task is scheduled to star t and the latest start time that is feasible for the task. The schedule data (11) is downloaded to a workstation (7). The downloaded data is displayed on a Gantt Chart and the task blocks on the display are colour coded according to their contingency values (C) to give a visual indication of their values.</S DOAB>
申请公布号 CA2403767(A1) 申请公布日期 2001.10.11
申请号 CA20012403767 申请日期 2001.03.01
申请人 BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY 发明人 POTHOS, DIONISIOS;LOWNDES, GEOFF;LAITHWAITE, ROBERT NOEL WILLIAM;ALLETSON, IAN STUART
分类号 G06Q10/00;(IPC1-7):G06F17/60 主分类号 G06Q10/00
代理机构 代理人
主权项
地址