<p>A method for building sheet pile walls comprises the steps of providing a first sheet pile (10), said first sheet pile (10) having a leading sheet pile interlock (14) with an interlock chamber (20); driving said first sheet pile (10) into the ground while protecting said interlock chamber (20) from ground material; providing a second sheet pile (10'), said second sheet pile (10') having a trailing sheet pile interlock (12') with an interlock head (16); engaging said interlock head (16) of said trailing sheet pile interlock (12') in said interlock chamber (20) of said leading sheet pile interlock (14); driving said second sheet pile (10') into the ground. The method further comprises the step of coating said interlock head (16) of said trailing sheet pile interlock (12') with fixing agent prior to engaging said interlock head (16) of said trailing sheet pile interlock (12') in said interlock chamber (20) of said leading sheet pile interlock (14).</p> |