发明名称 |
METHOD FOR INSTALLING RIGID GUARD FENCE ON BRIDGE PLATE DECK |
摘要 |
PURPOSE: A method for installing a rigid guard fence on a plate deck of a bridge is provided to install the guard fence only by connecting a wedge anchor embedded in the bottom of a precast type guard fence with a reinforcing rod anchor projecting on a plate deck when the guard fence is seated on the plate deck. CONSTITUTION: A method for installing a rigid guard fence on a plate deck of the bridge includes the steps of arranging a wedge type anchor, which is connected with a plurality of reinforcing rod anchors, in a row at the edge of a bridge plate deck hollowed in a prescribed depth, and seating a precast having a projection(16) formed on one side and a hole(15) formed on the other side. The projection of a precast(11) is coupled with the hole formed at another precast.
|
申请公布号 |
KR20010088760(A) |
申请公布日期 |
2001.09.28 |
申请号 |
KR20010053680 |
申请日期 |
2001.09.01 |
申请人 |
DONGIL ENGINEERING CONSULTANTS CO., LTD. |
发明人 |
AHN, SEUNG JU;KIM, MYEONG CHEOL;KIM, SU BO |
分类号 |
E01D19/12;(IPC1-7):E01D19/12 |
主分类号 |
E01D19/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|