发明名称 Procedure for planning of new constructions or repair measures on infrastructures located on sedimentation deposits entails calculating elevation of earth's surface from stressing of rock body on base of underground structure
摘要 The procedure for planning of new construction or repair measures entails determining the stressing of the rock body on the base of the underground structure and workings around it, and a calculation is made of the elevation of the earth's surface derived from it and through water rise inside the rock body and taken into account when planning the infrastructure buildings.
申请公布号 DE10052602(A1) 申请公布日期 2001.09.27
申请号 DE20001052602 申请日期 2000.10.24
申请人 ERHARDT, WILHELM;LOOS, JOACHIM 发明人 ERHARDT, WILHELM;LOOS, JOACHIM
分类号 E02D1/02;(IPC1-7):E04G21/00;E21C41/32;E02D27/34;E02D37/00;E04H9/02 主分类号 E02D1/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利