发明名称 WIRELESS DOWNHOLE MEASUREMENT AND CONTROL FOR OPTIMIZING GASLIFT WELL AND FIELD PERFORMANCE
摘要 A method for optimizing the production of a petroleum well is provided. The petroleum well includes a borehole, a piping structure (24) positioned withi n the borehole, and a tubing string (26) positioned within the borehole for conveying a production fluid. Production of the well is optimized by determining a flow rate of the production fluid within the tubing string (26 ) and determining a lift-gas injection rate for the gas being injected into th e tubing string. The flow rate and injection rate data is communicated along t he piping structure of the well to a selected location (44), where the data is collected and analyzed. After analysis of the data, an optimum operating poi nt (152) for the well can be determined
申请公布号 CA2401705(A1) 申请公布日期 2001.09.07
申请号 CA20012401705 申请日期 2001.03.02
申请人 SHELL CANADA LIMITED 发明人 HALL, JAMES WILLIAM;STEGEMEIER, GEORGE LEO;SAVAGE, WILLIAM MOUNTJOY;BURNETT, ROBERT REX;CARL, FREDERICK GORDON JR.;HIRSCH, JOHN MICHELE
分类号 E21B17/00;E21B34/06;E21B34/08;E21B34/16;E21B41/00;E21B43/12;E21B43/14;E21B47/06;E21B47/10;E21B47/12;E21B47/16;H04B5/00;(IPC1-7):E21B17/00 主分类号 E21B17/00
代理机构 代理人
主权项
地址