发明名称 AUTOMATED FINITE CAPACITY SCHEDULER
摘要 <p>A scheduler for a finite capacity process provides a schedule based on an integrated assessment of both discrete and continuous constraints. Given a list of products to be provided, the scheduler generates a set of activities required to produce the products and identifies resources required and the discrete and continuous constraints related to such resources. Activities are resized, and timelines are established for the activities as a function of deadlines for the product delivery for which the activities are related. Resource balancing heuristics are used to redistribute resource utilization to prevent bottlenecks. Data structures are used to keep track of constraints. Both discrete and continuous constraints are defined. Separate solver engines for the discrete and continuous constraint problems modify the constraints. The data structures are used to share and propagate constraints between the two engines. Infeasibilities of meeting product delivery times are detected during the scheduling and backtracking and rescheduling of resources based on under and over utilization and availability of equivalent resources is performed.</p>
申请公布号 EP1125233(A2) 申请公布日期 2001.08.22
申请号 EP19990954776 申请日期 1999.10.07
申请人 HONEYWELL INC. 发明人 BODDY, MARK, S.;JOHNSON, DANIEL, P.
分类号 G06Q10/06;G06Q10/08;(IPC1-7):G06F17/60 主分类号 G06Q10/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利