摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for omitting operations for arranging reinforcement and installing forms at a construction site for a building constructed of reinforced concrete. SOLUTION: A reinforced steel frame A is used as the skeleton of the building constructed of reinforced concrete, and form mounting rails B are fixed to the reinforced steel frame A by means of fixing bolts D. Further, the forms C are fixed to the form mounting rails B by means of bolts E. Since the reinforced steel frame A and the forms C are fixed together by means of the fixing bolts D with certain intervals therebetween, the forms also become self-contained and easier to install. An operation for arranging reinforcement can also be omitted and a series of operations at a construction site for the building constructed of reinforced concrete can be simplified.
|