发明名称 Reduction of coker furnace tube fouling in a delayed coking process
摘要 In a delayed coking process, furnace tube fouling is minimized by including a measured amount of full boiling range heavy gas oil as an additive in the furnace feed, preferably by forced recycle from a heavy gas oil stream. An additive is preferably supplied directly to individual furnace tubes by multiple circumferential injection upstream of each tube receiving the additive.
申请公布号 US6270656(B1) 申请公布日期 2001.08.07
申请号 US19990370165 申请日期 1999.08.09
申请人 PETRO-CHEM DEVELOPMENT CO., INC. 发明人 GIBSON WILLIAM C.;GIBSON ROBERT L.
分类号 C10B43/14;C10B55/00;C10G9/16;(IPC1-7):C10G9/16 主分类号 C10B43/14
代理机构 代理人
主权项
地址