Method for casting together a plurality of prestressed concrete elements (103) to a tank (100) with joints (1-19) between each respective concrete element (103) and pre-stress cables (43) guided through the concrete elements (103), where a first joint (1) starts to be filled and then, with a time delay, the subsequent respective joints (2, 3), etc., until all the joints (1-19) are filled. The joints are formed in such a way that joint concrete rises in a transcend hole positioned beside an embedded tube going through the concrete elements. Further, a tank comprising concrete elements prestressed both horizontally and vertically. |