摘要 |
gas mains. SUBSTANCE: proposed method comes to replacement of gas generator and power turbine by gas turbine engine with clockwise direction of rotation of power turbine rotor, finishing of bed frame, seal unit, centrifugal blower, air intake chamber, gas transfer set covering, fuel device unit, systems of lubrication, power supply, automatic control and instruments. Gas turbine engine and modified blower in combination with above-indicated modified processing systems form gas pumping set, i.e. device designed for implementing proposed method of reconstruction of compressor station. EFFECT: increased capacity of compressor station after reconstruction at maximum usage of compressor station processing equipment, simplified process of reconstruction and out down time taken for work. 3 cl, 2 dwg
|