发明名称 BLAST FURNACE OPERATING METHOD FOR IMPROVING FURNACE CONDITIONS DURING HIGHLY PULVERIZED COAL INJECTION
摘要 PURPOSE: A blast furnace operating method is provided to improve the first and second stages of the lower part of the body of the blast furnace, and the air permeability resistance index by removing non-burned carbon in which pulverized coal injected into the blast furnace is not completely burned, but piled up in the raceway. CONSTITUTION: In a blast furnace operation method comprising the processes of alternately charging sintering ore and cokes into the burden charging zone that is divided into 10 notches according to the tilting angle of a charging rotary chute from the furnace top, and injecting pulverized coal along with a high temperature air from a tuyere, the method further comprises the process of removing non-burned carbon that exists in the raceway which is generated during the injection of highly pulverized coal by charging small sinter comprising FeO into the wall part of the blast furnace.
申请公布号 KR20010063513(A) 申请公布日期 2001.07.09
申请号 KR19990060601 申请日期 1999.12.22
申请人 POHANG IRON & STEEL CO., LTD. 发明人 JANG, PIL SEON;KIM, JAE SIK;KIM, JONG MIN;SEO, GWANG YONG
分类号 C10B29/02 主分类号 C10B29/02
代理机构 代理人
主权项
地址