发明名称 Verfahren und Vorrichtung zur Zeitplansteuerung von Teileliefereinrichtungen und Verfahren zum Managen der Teileliefereinrichtungen
摘要 <p>For delivering parts successively received in shipment units by parts deliverer to part use positions, the delivering operation time required for each parts deliverer is uniformalized. A uniformalizing plan is produced, and the delivering operation is continued according to the plan. The delivering operation time is calculated for each shipment unit (first step). The assignment of shipment units to parts deliverers is shifted such as to uniformalize the delivering operation time for each parts deliverer (third step). The shifting operation is continued until uniformalizing is obtained. As a result, uniformalized assignment can be realized. <IMAGE></p>
申请公布号 DE69427215(D1) 申请公布日期 2001.06.21
申请号 DE1994627215 申请日期 1994.09.19
申请人 TOYOTA JIDOSHA K.K., TOYOTA 发明人 ASAHARA, TAKAO;FUKUYAMA, TAKESHI;KUNIMOTO, HIROFUMI;TANAKA, KATSUHIRO;TOMIMORI, TOSHIKAZU
分类号 G06Q50/04;B65G61/00;G05B19/418;G06Q10/08;G06Q50/00;G06Q50/28;(IPC1-7):G05B19/418;G06F17/60 主分类号 G06Q50/04
代理机构 代理人
主权项
地址