发明名称 WORKING METHOD FOR GROUND-IMPROVEMENT CONSTRUCTION WORK ACCOMPANIED BY GROUND UPHEAVAL IN SHALLOW SEA
摘要 PROBLEM TO BE SOLVED: To efficiently conduct ground-improvement construction works accompanied by a ground upheaval, such as compaction sand-pile driving in a shallow sea without the possibility of work interruption. SOLUTION: An area A of preceding improvement is improved in a triangular shape, in which an intersection angleαbetween the front edge 3 of the area A and a side edge 4 on the area B side of adjacent improvement is an acute angle, a working craft 1 is transferred to an area B, the working craft 1 is moved intermittently to an oblique rear section under the state in which only one-side corner section 5 of the front end section of the working craft 1 is protruded into the area A, the area B is improved in a parallelogram and an area C, an area D, etc., are also improved similarly.
申请公布号 JP2001152437(A) 申请公布日期 2001.06.05
申请号 JP19990376016 申请日期 1999.11.26
申请人 FUDO CONSTR CO LTD 发明人 NOUCHI ISATO;TAKAKURA TAKESHI
分类号 E02D3/00;(IPC1-7):E02D3/00 主分类号 E02D3/00
代理机构 代理人
主权项
地址