发明名称 HOISTING WORK MANAGING SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a system for managing hoisting work for reducing time loss and material loss in the conveyance of materials as much as possible and minimizing the loss of the cost when hoisting construction materials to a prescribed floor on the construction site. SOLUTION: The actual hoisted result managing system for construction materials has a means for receiving/displaying a separately prepared hoisting schedule, using it as the guideline of actual work and recording the work result and has a stock managing means based on hoisting work result data and a computer readable recording medium having a program for making a computer function thereon, where the medium is used as a means for receiving/displaying the hoisting schedule, and using it also as the guideline of actual work and for recording the work result and as a stock managing means based on the hoisting work result data.
申请公布号 JP2001142998(A) 申请公布日期 2001.05.25
申请号 JP19990322286 申请日期 1999.11.12
申请人 POWERS SERVICE CO LTD 发明人 YORIMITSU HIROKAZU
分类号 E04G21/00;G06F19/00;G06Q10/08;G06Q50/00;G06Q50/08;G06Q50/28 主分类号 E04G21/00
代理机构 代理人
主权项
地址