发明名称 GRAVEL DRAIN METHOD APPLIABLE TO STABILIZATION OF POOR GROUND, GRAVEL COMPACTION PILE METHOD, AND CONSTRUCTION APPARATUS SUITABLE FOR METHODS
摘要 PURPOSE: A gravel-drain(GD) method appliable to the stabilization of poor ground, a gravel compaction pile(GCP) method, and a construction apparatus suitable for the methods are provided to reduce construction costs and to facilitate supply and demand by using gravel instead of sand. CONSTITUTION: A GD method comprises six steps. In the first step, a vibration hammer(1) is operated, and a casing pipe(2) is inserted into the ground. In the second step, gravel is supplied into the inside of the casing pipe through a hopper. In the third step, the inside of the casing pipe is pressed so that the internal pressure reaches a designed pressure. In the fourth step, the casing pipe is pulled out about 3 meters. In the fifth step, the pulled casing-pipe is inserted again by the vibration hammer, and the inside gravel column of the casing pipe is compacted. In the sixth step, the casing pipe is pulled out until the gravel of the casing pipe keeps 1.5 meters, and then the steps from 2 to 6 are repeated.
申请公布号 KR20010037628(A) 申请公布日期 2001.05.15
申请号 KR19990045265 申请日期 1999.10.19
申请人 SEOK JUNG ENGINEERING & CONSTRUCTION CO. 发明人 KIM, BAEK YEONG
分类号 E02D3/10;(IPC1-7):E02D3/10 主分类号 E02D3/10
代理机构 代理人
主权项
地址