发明名称 LOADING METHOD FOR MATERIAL
摘要 PROBLEM TO BE SOLVED: To safely load materials such as crushed stones without dispersing, to enable simultaneous operations in the top/bottom of a vertical shaft, to arbitrarily load the materials irrelevant to the carry-out consumption, and to stably supply the loading materials of favorable grain size balance to a material carry- out part in loading the crushed stones using the vertical shaft in backfilling an old underground gallery. SOLUTION: A loading pipe 2 is installed in the vertical shaft from a top material loading part to the bottom material carry-out part with its bottom end positioned above the bottom face 1a of the material carry-out part, the crushed stones are accumulated in the lower part of the loading pipe 2 and the bottom of the loading pipe 2, the crushed stones are carried out of a stable and conical material accumulation pile by a mini backhoe, a forklift, etc., the crushed stones are smoothly lowered and replenished from the bottom end of the loading pipe 2 to form the stable and conical accumulation pile, and the crushed stones are thus replenished in the loading pipe 2 and always accumulated in the lower part of the loading pipe and in the bottom of the loading pipe.
申请公布号 JP2001132398(A) 申请公布日期 2001.05.15
申请号 JP19990313794 申请日期 1999.11.04
申请人 SAKATA CONSTRUCTION CO LTD 发明人 TAGUCHI JINICHI
分类号 E21F15/00;(IPC1-7):E21F15/00 主分类号 E21F15/00
代理机构 代理人
主权项
地址