发明名称 IMPROVEMENT METHOD FOR SURFACE LAYER OF POOR GROUND
摘要 PURPOSE: A method to improve a surface layer of a poor ground is provided to reduce a term of works and cost. CONSTITUTION: An improving method comprises four steps. In the first step, vertical or horizontal drain materials(1) are installed in a surface layer of a poor ground at regular intervals. In the second step, the drain materials are connected with drain pipes(22) connected with an outside pump(21). In the third step, vinyl sheets(2) cover the surface of the poor ground to contain surface water(3). In the fourth step, underground water is collected in the drain material while the pump supplies intake vacuum-pressure to the drain material. The underground water is exhausted to the outside through the drain pipe and pump.
申请公布号 KR20010038244(A) 申请公布日期 2001.05.15
申请号 KR19990046141 申请日期 1999.10.22
申请人 DAEWOO ENGINEERING & STRUCTURE CO., LTD. 发明人 KIM, SEONG JUN;KIM, SEONG UN;KIM, YU SEOK;PARK, JUNG BAE
分类号 E02D3/10;(IPC1-7):E02D3/10 主分类号 E02D3/10
代理机构 代理人
主权项
地址