摘要 |
The Eb/No estimation process generates two streams of power control bits that are transmitted to the base station. One of the power control bit streams is generated under the assumption that the frame rate has not changed. The other power control bit stream is generated under the assumption that the frame rate has changed. The base station, knowing whether or not the frame rate changed, chooses the appropriate stream to use in controlling the base station transmit power.
|