发明名称 Method for setting posts in ground involves supplying prefabricated unit of stand for post set in concrete plinth which is then inserted in dug-out hole together with sand and cement mixture to which water is then added
摘要 The stand foot (6) of the post is concreted into a concrete plinth (5) at the suppliers and transported as a prefabricated unit to the site. A hole larger in diameter than that of the plinth is dug out in the centre of the post site and a mixture of sand and cement is used to fill the hole up to a depth of hole depth minus distance of lower edge of post plus lower edge of plinth. The prefabricated unit is inserted and the space between jacket of concrete body and hole boundary wall is filled with thin concrete. The post foot is finely adjusted and water poured into the hole and sand and cement mixture.
申请公布号 DE10030966(A1) 申请公布日期 2001.05.10
申请号 DE20001030966 申请日期 2000.06.24
申请人 KOCH, HEINER 发明人 KOCH, HEINER
分类号 E02D27/42;E04H12/22;(IPC1-7):E04H12/22;E04H12/34 主分类号 E02D27/42
代理机构 代理人
主权项
地址