摘要 |
PROBLEM TO BE SOLVED: To provide an urban large-capacity multistory parking garage shortening the moving-in/out cycle time for vehicles and utilizing the space of a site above and under the ground at maximum. SOLUTION: Each floor has a liaison passage and a parking space, and a parking space is also provided at the ceiling portion of each floor above this parking space. A dedicated lift is installed for the parking space of each floor, and the dedicated lift lifts a pallet mounted with an automobile for parking. Rails (a), b for horizontally shifting the pallet mounted with the automobile are installed in the liaison passage and the parking space on the floor surface of each floor for moving-in/out the automobile.
|