发明名称 Method to form sealing foundations for static constructions during tunnel building etc. uses erosion tool in combination with drilling rods and guide rods
摘要 An erosion tool is inserted by drilling rods into the ground through a pilot bore, ground material is eroded and mixed with sealant to form a mainly horizontal sealing foundation element. At least one set of guide rods is positioned in the ground at a distance to the drilling rods with an overlap area of two neighboring sealing elements. The guide rods guide the erosion tool while it is drawn trough the pilot bore. The guide rods are drawn after fabrication of neighboring sealing elements. The erosion tool (100) has a connection (14) for drilling rods, and at a distance to it, a guide ring (16) for engagement with guide rods.
申请公布号 DE19940774(A1) 申请公布日期 2001.04.19
申请号 DE19991040774 申请日期 1999.08.27
申请人 KELLER GRUNDBAU GMBH 发明人 KRENTZ, MARTIN
分类号 E02D19/16;E21D11/38;(IPC1-7):E02D31/00 主分类号 E02D19/16
代理机构 代理人
主权项
地址