发明名称 CONSTRUCTION OF PARTITION WALL
摘要 PROBLEM TO BE SOLVED: To improve workability by fixing upper and lower frames with a predetermined width in a panel having a facing material stuck to one side to the side faces of rails arranged in the ceiling and the floor and provided with a square section. SOLUTION: While a facing material 2 is stuck to one face of a rectangular framework 1, the width of upper and lower frames 11, 12 in the framework 1 is narrowed by the width of supporting rails 4, 5 in comparison with that of a vertical frame 13 and a horizontal beam 14. Then, the rails 4, 5 are formed of long wooden materials and the like provided with a square cross section so as to be individually fixed to a ceiling part 6 and a floor part 7 in a building. In construction, the framework 1 is fixed by abutting the upper frame 11 to the side face of the rail 4 and abutting the lower frame 12 to the side face of the rail 5, so that the rails 4, 5 and the vertical frame 13 and the horizontal beam 14 are set flush with each other substantially. In addition, on the side face of the flush framework 1, a facing material 3 is stuck for forming a partition wall A. In this way, constructing and finishing can be carried out easily, and alignment precision can be easily improved.
申请公布号 JP2001073487(A) 申请公布日期 2001.03.21
申请号 JP19990247721 申请日期 1999.09.01
申请人 SEKISUI CHEM CO LTD 发明人 KUROKAWA MARIKO
分类号 E04B2/82;(IPC1-7):E04B2/82 主分类号 E04B2/82
代理机构 代理人
主权项
地址