摘要 |
PROBLEM TO BE SOLVED: To reduce execution man-hours, and reduce a material usage by forming a projection part on a vertical material constituted in the form of a lattice, providing a notch part on a horizontal material positioned on the projection part, and inserting the mesh of a filling reinforcing member in the projection part. SOLUTION: The projection part 2A is formed on a vertical rod 2 constituted in the form of a lattice, and a notch part 4 is provided on a horizontal rod 5 positioned on the projection part 2A. In the case where the filling reinforcing member 6 is connected, the part of the wide mesh of the center part of the filling reinforcing member 6 is inserted in the projection part 2A of the vertical rod 2 and the horizontal rod 5 by using the notch part 4. Next, if the filling reinforcing member 6 is pulled while moving it horizontally, it is in a connection completion state. In other words, the projection part 2A of the vertical rod 2 and the folding part 5A of the horizontal rod 5 on the connection member are contacted on and connected to the narrow mesh of the end of the filling reinforcing member 6 respectively. Thus, since the slipping-off of the filling reinforcing member is prevented only by inserting it in the mesh of the filling reinforcing member and moving a position, the execution man-hours can be reduced and a material usage can be reduced.
|