发明名称 |
METHOD OF BLAST-FURNACE BLOWING-IN |
摘要 |
ferrous metallurgy; applicable in blowing-in of new blast furnaces or after their major repairs of I and II categories. SUBSTANCE: method includes charging of 0.01-0.5 volume of furnace with burden featuring high heat capacity per unit volume after ignition of coke on tuyeres and beginning of burden coming-off during charging of the second volume. Then charging of burden is continued with ore loading of 2.8-3.5 t/t up to the first tapping. Heat capacity per unit volume is increased by increasing ore-flux batches in charging and increased fraction of materials with high heat capacity per unit volume in ore-flux batches. EFFECT: reduced consumption of coke in blowing-in period, prevented overheating of top gases and equipment of furnace top, reduced time for attaining working parameters of blast furnaces. 3 cl, 2 dwg
|
申请公布号 |
RU2164242(C2) |
申请公布日期 |
2001.03.20 |
申请号 |
RU19990111395 |
申请日期 |
1999.05.31 |
申请人 |
OTKRYTOE AKTSIONERNOE OBSHCHESTVO "NOVOLIPETSKIJ M;NOVOLIPETSKIJ M AOOT |
发明人 |
GRIGOR'EV V.N.;AL'TER M.A.;EMEL'JANOV V.L.;MJASOEDOV V.A.;ANAN'EVSKIJ V.G.;TITOV V.N.;LYSENKO S.A. |
分类号 |
C21B3/00;(IPC1-7):C21B3/00 |
主分类号 |
C21B3/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|