发明名称 Construction method for underground columns of granular filler material uses displacement tube driven into ground, filled with material, and withdrawn to drive filler material against bore hole wall
摘要 A displacement tube is driven into the ground, filled with material, and then withdrawn, so that the filler material exits from the lower tube end against the wall of the bore hole. The tube is withdrawn in several stages, and after every stage, the material is further compressed by driving-in the tube. The appliance to carry out the process has a displacement tube (6) with a guide part located in the tube near its outlet (10). The guide part has a pivoted flap arrangement. The tube outlet is connected to a foot plate (11) for driving-in the tube. The top of the tube is connected to a filler funnel (9).
申请公布号 DE19942016(A1) 申请公布日期 2001.03.08
申请号 DE19991042016 申请日期 1999.09.03
申请人 FRANKI GRUNDBAU GMBH 发明人
分类号 E02D5/38;(IPC1-7):E02D5/38 主分类号 E02D5/38
代理机构 代理人
主权项
地址