发明名称 PLATE CONNECTION STRUCTURE FOR SANDWICH FLOOR SLAB, FORMATION OF SANDWICH FLOOR SLAB, BOLT AND WASHER SET, AND BOLT AND NUT SET
摘要 PROBLEM TO BE SOLVED: To repair a concrete floor slab for an existing bridge to form a sandwich floor slab. SOLUTION: A first bolt 6 having a large diameter screw (right-hand thread) 19 and a small diameter screw (left-hand thread) and a connecting nut 10 having a left-hand thread 45 at one end side and a right-hand thread 46 at the other end side are prepared. A lock nut 9 is screwed on the large diameter screw 19 and the first bolt 6 is fitted to a lower plate 3. The left-hand thread 45 of the connecting nut 10 is screwed on the small diameter screw 20 and further, the second bolt inserted in the bolt hole of the upper plate is screwed on the right-hand thread 46 and the second bolt 7 is turned to corotate together with the connecting nut 10 to move it up. Then, concrete is placed in a through hole 4.
申请公布号 JP2001055711(A) 申请公布日期 2001.02.27
申请号 JP19990231088 申请日期 1999.08.18
申请人 NICHIA STEEL WORKS LTD;SHO BOND CONSTR CO LTD 发明人 ETSUNO YUJI;TAIRA KOJI;YAMAGUCHI KAZUNARI;ARIKADO KAZUHIRO;ATSUIZUMI SHIGEHARU;SHIROOKA HIDETOSHI
分类号 E01D19/12;F16B5/06;F16B35/00;F16B37/04;(IPC1-7):E01D19/12 主分类号 E01D19/12
代理机构 代理人
主权项
地址