摘要 |
<p>PROBLEM TO BE SOLVED: To improve processing efficiency by shortening a time from completion of processing till start of the next processing with an inexpensive and simple construction. SOLUTION: A mobile loader 13 is reciprocated between first and second processing stations S1, S2. A sub frame 17 is installed at the lower side of a main frame 15, and a pressing means 18 for pressing the work on processing tables 11, 12 is installed to the sub frame 17 in order to fix the work being positioned during processing. The main frame 15 and the sub frame 17 are coupled with a floating connector 19 which allows the relative movement of the frames in a given range in a loader moving direction.</p> |