发明名称 WORKING FACILITIES HAVING PIT AND METHOD FOR CONSTRUCTION THE SAME
摘要 PROBLEM TO BE SOLVED: To lower the construction cost and to shorten a construction period till completion on the occasion of constructing an underground pit for maintenance of an automobile. SOLUTION: In regard to these working facilities having a pit and a method for construction thereof, the pit in an underground part below a floor board made of concrete or steel is formed by embedding a container in the ground. After a pit room manufacturing process A for installing necessary equipment inside the container for forming the underground pit and a process B of civil engineering works for digging a hollow for installing the container in the ground are executed separately, an underground container installing process C for installing the container in the hollow and a floor board providing process D for providing the floor board made of concrete or steel to enable access of an automobile onto the container from the ground surface are executed.
申请公布号 JP2001040892(A) 申请公布日期 2001.02.13
申请号 JP19990215944 申请日期 1999.07.29
申请人 OOTOBATSUKUSU SEVEN:KK 发明人 IWAHARA TORU
分类号 E02D29/00;E04H5/06;(IPC1-7):E04H5/06 主分类号 E02D29/00
代理机构 代理人
主权项
地址