发明名称 GROUTING CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide an efficient grouting construction method having a theoretical basis in grouting conditions and capable of contributing to reduction of the construction cost for large-scale structure such as a dam. SOLUTION: Each reference value of grout injection conditions containing the grouting pressure, concentration and flow rate of a grout at a time when a void composed of the discontinuity plane of a rock mass is assumed as a pipeline to the change of an index value displaying the water permeability of the rock mass 2 is obtained previously, and a grout injection hole 13 is formed to the rock mass 2. The permeability test of the rock mass 2 in the grout injection hole 13 is conducted and the index measured value of water permeability is obtained at that time, and the grouting pressure, concentration and flow rate of the grout to the index measured value of the water permeability are determined on the basis of each reference value of grout injection conditions.
申请公布号 JP2001040650(A) 申请公布日期 2001.02.13
申请号 JP19990215904 申请日期 1999.07.29
申请人 KANSAI TLO KK 发明人 KIKUCHI KOKICHI;MITO YOSHITADA;MUTO HIKARI;SUZUKI TETSUYA;MAEHARA MASAYUKI
分类号 E02D3/12;E02D1/02;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址