发明名称 SOIL IMPROVING METHOD FOR GROUND UNDER FLOOR SLAB, AND REINFORCING MEMBER
摘要 PROBLEM TO BE SOLVED: To improve soil, hardly changing the present situation of a floor slab, and besides, with reinforcing bars constructed in the soil. SOLUTION: A plurality of branch reinforcing bars 6 are radially arranged in the middle of a trunk reinforcing bar 2 in a cavity G from a through hole S1 cut in a floor slab S. A reinforcing member 1 in which these branch reinforcing bars are pivotably attached in an oscillating manner between the expanding direction and the upwardly overlapping direction is inserted with the branch reinforcing bars upwardly overlapping condition. The branch reinforcing bars passing through the through holes are opened in the expanding direction within the expanding direction in the cavity, and the grouting material is poured into the cavity from the through hole.
申请公布号 JP2001032260(A) 申请公布日期 2001.02.06
申请号 JP19990203743 申请日期 1999.07.16
申请人 FUKUI DERIKA KK 发明人 YAO KINICHIRO
分类号 E02D3/12;E02D35/00;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址