摘要 |
<p>PROBLEM TO BE SOLVED: To normally install a handrail in a unit bath even if there is no backing as well as to install a handrail in a house even if there is no backing on an installing wall surface. SOLUTION: A part of a grip bar 1 of a handrail and a pedestal 2 part for supporting the part are integrally formed. An adhesive 4 is applied to the whole pedestal 2 part of the handrail contacting with a wall surface of a unit bath, and holes are bored in several places in a wall of the unit bath and a pedestal 2 of the handrail for reinforcement to be fixed through parachute machine screws 3 with packing. A handrail in a house is also adjusted to a stud position of an installing wall backing by integrating the grip bar 1 and the pedestal 2 to be freely fixed from above the pedestal 2 by the machine screws 3.</p> |