发明名称 REINFORCED CONCRETE PILE FOR PILE FOUNDATION WORK
摘要 PROBLEM TO BE SOLVED: To provide a reinforced concrete pile for pile foundation work capable of facilitating the chipping of a pile head after a reinforced concrete pile is driven or developed in the ground. SOLUTION: A reinforced concrete pile 10 has at least a plurality of main bars arranged inside thereof, and it is constituted of a pile head 13 provided to the end on the opposite side to the driving end in the ground and removed after the reinforced concrete pile 10 is driven in the ground and a pile main body section 12 monolithically formed in the pile head 13 in succession. the ends of the main bars 11 arranged in the pile main body section 12 enter the inside of the pile head 13 from the pipe main body section 12, and the length of the ends 11a of the main bars 11 located in the pile head 13 is the length necessary for connecting another reinforcing bar used as an anchor when the pile head 13 is removed.
申请公布号 JP2001011852(A) 申请公布日期 2001.01.16
申请号 JP19990184366 申请日期 1999.06.29
申请人 MAEDA CORP 发明人 HASHIMOTO NAOHIKO
分类号 E02D5/30;(IPC1-7):E02D5/30 主分类号 E02D5/30
代理机构 代理人
主权项
地址