发明名称 METHOD AND APPARATUS FOR CONTROLLING BLOWING IN CONVERTER
摘要 PROBLEM TO BE SOLVED: To provide a method for controlling the blowing in a converter, by which gaseous oxygen supplying quantity at the end stage of blowing is optimally controlled and the lowering of a hitting accuracy caused by change in the lapse of time of the repeated use of the converter is prevented and the hitting ratio to an aimed value of carbon concn. in molten steel at the end point of blowing can be improved. SOLUTION: In the converter blowing control method, with which the necessary gaseous oxygen quantity from a measured time of the carbon concn. in the molten steel to the blowing stopping time is calculated (S16) by showing carburizing speed as a function of the carbon concn. in the molten steel and integrating the function from the carbon concn. in the molten steel measured at the end stage of blowing to the aimed carbon concn. and the calculated oxygen quantity is blown into the molten steel (S22), plural factors included in the function are made to the summations of the functions of plural operational conditions influencing on the respective decarburizing speeds and learning items corrected at each time of completing the blowing control, and factors included in the functions of the operational condition are decided based on plural times of the actual data in the blowing control (S4), and the learning items are corrected based on the difference between the actual carbon concn. and the aimed carbon concn. at the each time of completing the blowing control (S28).
申请公布号 JP2001011520(A) 申请公布日期 2001.01.16
申请号 JP19990177394 申请日期 1999.06.23
申请人 SUMITOMO METAL IND LTD 发明人 IWAMURA TAKESHI
分类号 C21C5/30;C21C5/32;(IPC1-7):C21C5/30 主分类号 C21C5/30
代理机构 代理人
主权项
地址