摘要 |
The procedure for the execution of the movements of the lifting elements (1, 2, 3, 6, 7) is such that the elements are moved alternately or simultaneously, such that the crane finds the optimum position for executing the required lift. The device for carrying out the movements is designed to produce the optimized lifting conditions. An Independent claim is also included for a device for optimizing lifting conditions of crane. |