发明名称 |
Monitoring completeness of trains involves monitoring mechanical signal converted from main air line pressure at far end of train and propagated back along main air line to near end |
摘要 |
The method involves specifying a pressure at one end (16) of the train in a main air line (8) connecting its wagons (2,4,6) and converting the pressure into a mechanical signal at the other end (14) of the train. The mechanical signal is propagated tthrough the main air line to the first air line and detecting it and comparing the detected mechanical signal with the predefined pressure to decide whether the train is complete. An Independent claim is also included for an arrangement for monitoring the completeness of a train.
|
申请公布号 |
DE19930252(A1) |
申请公布日期 |
2001.01.11 |
申请号 |
DE19991030252 |
申请日期 |
1999.06.25 |
申请人 |
DAIMLERCHRYSLER AG |
发明人 |
KALBERLAH, HENNING;HIMMELSTEIN, GUENTER;OTT, NORBERT;ECKERT, GERHARD |
分类号 |
B61L15/00;(IPC1-7):B61L15/00 |
主分类号 |
B61L15/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|