发明名称 Arrangement for delivering continuous flow of goods or materials to furnace has main waste hopper, separate additional hopper opening into additional shaft, blocking cap, delivery element
摘要 The arrangement has a main waste hopper (7) with a main shaft (8) and main sliding delivery element (5) and a separate additional hopper (1) that opens into an additional shaft (3), whereby a blocking cap (2) is arranged between the additional hopper and the shaft. The sliding delivery element is arranged so that the additional material is fed into the main flow immediately before the furnace.
申请公布号 DE19929498(A1) 申请公布日期 2001.01.04
申请号 DE19991029498 申请日期 1999.06.28
申请人 NOELL-KRC ENERGIE- UND UMWELTTECHNIK GMBH 发明人 RUDOLPH, ABBY-CHRISTOPH;SCHMITZ, ROLF;FAATZ, RAINER
分类号 F23G5/44;(IPC1-7):F23G5/44 主分类号 F23G5/44
代理机构 代理人
主权项
地址