摘要 |
<p>PROBLEM TO BE SOLVED: To model constituting elements and processes in a job site, and to flexibly change process management or lot flow control or the like according to the change of work contents based on this model. SOLUTION: In this process managing system, a controller 10 is provided with a defining part 12 which controls a host 30 and a work terminal 40 arranged at a prescribed work place for transferring a prescribed message with the host 30 to which lot information is inputted, and defines a prescribed model, a control part 14 which generates information for control for controlling the lot processing in the host 30 and the work terminal 40 based on the definition of the model, and a transmitting and receiving part 18 which transmits information for control to the host 30 and the work terminal 40 in response to a request from the host 30 and the work terminal 40. Then, the lot flow control is operated by using the controlling device 10.</p> |