发明名称 INVERTED CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide an inverted construction method in which a small number of opening parts to be open in the first story above ground are sufficient, efficiency in the work of moving load is satisfactory, and it is possible to improve work environments. SOLUTION: The second basement level is taken as a work floor, and a traveling rail 5 for a hoist crane 4 is installed beneath the floor of the first story above ground i.e., in the ceiling of the work floor. One to a few opening parts 1 are provided in the first story above ground, and a traverser 3 is installed between the opening part 1 and a travelling rail 5 for the hoist crane 4. As the traverser 3 enables the hoist crane 4 to move horizontally together with a part of the traveling rail 5 i.e., a movable-type traveling rail 5', it is possible to move a load 2 temporarily placed on the work floor freely horizontally from the traverser 3 along the travelling rail 5 for the hoist crane 4.
申请公布号 JP2000314145(A) 申请公布日期 2000.11.14
申请号 JP19990123017 申请日期 1999.04.28
申请人 TAISEI CORP 发明人 SUZUKI HIROYUKI;KURAUCHI TORU;EJIMA AKIRA;NISHIMURA MASAHIRO;SUDO TAKUO;YOSHIKAWA AKIO
分类号 E02D29/045;E21D13/00;(IPC1-7):E02D29/045 主分类号 E02D29/045
代理机构 代理人
主权项
地址