发明名称 PS STEEL PRE-STRESSING METHOD FOR PERFORMANCE IMPROVEMENT OF BRIDGE
摘要 PURPOSE: A PS steel pre-stressing method for performance improvement of bridge is provided to improve a work capacity by pre-stressing the PS steel with lower part of girder in the girder and prevent the loss of pre-stress force of PS steel. CONSTITUTION: A PS steel pre-stressing method for performance improvement of bridge comprises the steps of; installing anchorage(4) in the supporting point to anchor a PS steel(2) to the upper part of girder; anchoring the both ends of PS steel loosely to the anchorage; installing a fixing member(6) in the lower part of girder(1) placed in between the supporting points so that one PS steel or more can pass through; pre-stressing the PS steel in the fixing member and then fixing.
申请公布号 KR20000063499(A) 申请公布日期 2000.11.06
申请号 KR20000041178 申请日期 2000.07.18
申请人 ILL SEUING CONS & ENG. LTD 发明人 PARK, CHANG RYEOL
分类号 E01D22/00;(IPC1-7):E01D22/00 主分类号 E01D22/00