PS STEEL PRE-STRESSING METHOD FOR PERFORMANCE IMPROVEMENT OF BRIDGE |
摘要 |
PURPOSE: A PS steel pre-stressing method for performance improvement of bridge is provided to improve a work capacity by pre-stressing the PS steel with lower part of girder in the girder and prevent the loss of pre-stress force of PS steel. CONSTITUTION: A PS steel pre-stressing method for performance improvement of bridge comprises the steps of; installing anchorage(4) in the supporting point to anchor a PS steel(2) to the upper part of girder; anchoring the both ends of PS steel loosely to the anchorage; installing a fixing member(6) in the lower part of girder(1) placed in between the supporting points so that one PS steel or more can pass through; pre-stressing the PS steel in the fixing member and then fixing.
|
申请公布号 |
KR20000063499(A) |
申请公布日期 |
2000.11.06 |
申请号 |
KR20000041178 |
申请日期 |
2000.07.18 |
申请人 |
ILL SEUING CONS & ENG. LTD |
发明人 |
PARK, CHANG RYEOL |
分类号 |
E01D22/00;(IPC1-7):E01D22/00 |
主分类号 |
E01D22/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|