摘要 |
PROBLEM TO BE SOLVED: To lower the carry-in cost by loading a quantity of necessary materials together on a truck according to the progress of construction at a plurality of sites by integrating materials which need to be carried in, calculating the total weight and volume of the members and determining the combination of construction sites matching the capacity of the truck. SOLUTION: Construction progress data and data on materials which are already distributed are grasped for each construction site and materials which need to be carried in for processes to be advanced in a certain subsequent period are integrated by using both data. The total weight and volume of the integrated members are calculated and a combination of the plurality of construction sites matching the capacity of the truck is determined. Consequently, the materials can be carried to the individual sites by a mixedly loaded truck to perform distribution without any waste, and the cost and energy can be saved. Further, the construction progress data and data of materials which are already distributed are grasped for each construction site and the member carry-in management is performed, so no material deficiency is caused. |