摘要 |
PROBLEM TO BE SOLVED: To improve the wallboard temporary supportability and workability of a bracket fixing wall boards in first floor and second floor sections. SOLUTION: In this bracket for receiving a exterior wall material in a vertical direction, a horizontal piece 11b along the lower end 3b of a wallboard 3 is formed integrally to a vertical piece 11a along the rear 3a of the wallboard 3, an inclined plane 12 protruded to the wallboard surface side gradually towards a lower section is formed at the upper edge of the vertical piece 11a and a recessed section 13 is formed to the lower section of the inclined plane 12, a rib-shaped projecting section 14 abutted against the surface of the lower end 3b of the wallboard 3 is shaped to the horizontal piece 11b, a drooping piece 11c in length approximately the same as the joint opening between the upper and lower wallboards 3, 3 is formed integrally to a lower section from the projecting section 14, a cover piece 11d along the top face 3c of the lower wallboard 3 is formed in the direction parallel with the horizontal piece 11b from the lower end of the drooping piece 11c, and a lower vertical piece 11e along the rear 3d of the lower wallboard 3 is formed to a lower section from the terminal of the cover piece 11d.
|