METHOD FOR FILLING GAP IN BUILDING |
摘要 |
PROBLEM TO BE SOLVED: To surely and effectively reinforce the strength of a civil engineered building such as the extension beam of a bridge by completely filling a clearance that forms in a wide range of a gap in the tie-in portion between an upper flange and the lower surface of a floor board of, e.g. a bridge. SOLUTION: A filling bag band 15 is installed in a gap portion at the tie-in portion between an upper flange 7 and the lower surface of a floor board 4. The gap portion is filled with a first filler 5 and a second gap filler 6 is injected from a conduit 10 whereby the part of the gap portion which is not yet filled with the first filler 5 can be filled with the second filler 6 via the filling bag band 15. |
申请公布号 |
JP2000290932(A) |
申请公布日期 |
2000.10.17 |
申请号 |
JP19990095507 |
申请日期 |
1999.04.01 |
申请人 |
KAWASHIMA BUSSAN KK;KAWASHIMA KENSETSU KK;DENKI KAGAKU KOGYO KK |
发明人 |
KAWASHIMA TADAO;KOSUGE KEIICHI;ANDO TOSHIHIRO;NAKANO KAZUO |
分类号 |
E01D21/00;E01D22/00;E01D101/40;E04G21/02;(IPC1-7):E01D21/00 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|