发明名称 METHOD FOR MODIFYING WELL USING PIPE BASE SCREEN
摘要 PROBLEM TO BE SOLVED: To prevent sand pumping without spoiling water pumping capacity in spite of existence of sand pumping in a well using a pipe base screen by the optimum modifying engineering method. SOLUTION: A newly provided casing string 11 having a V slot screen 10 is inserted in an existing casing string 8 and both of the screens 7, 10 are made to face against each other under this modifying method of a well. Ballast 12 is filled to a position higher than a still water level in a ring clearance A of the existing and newly provided casing strings 8, 11. Thereafter, finishing by partial surging is carried out in the V slot screen 10, the filled ballast 12 is made to flow in an aquifer 13 from a round hole of a pipe base 3 and filled, a ballast wall is made thicker, sand pumping is prevented, and water pumping capacity is increased.
申请公布号 JP2000265499(A) 申请公布日期 2000.09.26
申请号 JP19990068640 申请日期 1999.03.15
申请人 SANKYO KOGYO KK 发明人 HONGO KANJIRO
分类号 E03B3/15;(IPC1-7):E03B3/15 主分类号 E03B3/15
代理机构 代理人
主权项
地址