摘要 |
PROBLEM TO BE SOLVED: To certainly make elevator passengers selectively get in double deck elevators and enhance the transportation capability by altering the enroute configurations of the double deck elevators according to the traffic demand. SOLUTION: This operation control device for double deck elevator installed solely or with a plurality of elevator units installed in line is equipped with a simulation means to perform a single run or a plurality of runs of simulating calculations about a plurality of operation controlling schedules on a plurality of traffic demand conditions prepared for each traffic demand as applicable, wherein the arrangement includes operation control method calculating means P03 and T06 to acquire a plurality of operation control methods for each traffic demand, an operation control method selecting means P07 to select one of the acquired operation control methods, and an operation control method P06 to make operational control of the double deck elevator according to the selected operation control method. |